Building a Pool

Building a swimming pool requires careful effective planning. What will determine how effective your planning process is, will be your awarenes of important prebuild considerations. . These considerations are determined by your requirments and the suitabilty of the site in whilch development is to take place.

With over 30 years experience in swimming pool construction for domestic and commercial sectors, we have outlined below all factors that should be considered at this intial stage to ensure you acheive a successful swimming pool development.

Access to Site

Consideration would have to made for accessing your garden with plant equipment and for the removal of soil.

Ground conditions - Clay, chalk, high water table, e.t.c.

What will you be excavating and how do you intend to dispose of this material? Is there a high water table? This is not a design issue as we have come up against many ground conditions. If detected at an early stage we will be able to advise you accordingly.

Size/depth of the swimming pool

How big do you want the pool and what style & depth do you require?

Orientation of the swimming pool

Where is the swimming pool to be placed in relation to any adjoining buildings, walls etc. Other factors include wind, shade and overall views of the swimming pool from the house and possibly your neighbours property, prevailing winds.

Positioning of flow control, lights or steps/bays

What extras do you want on the swimming pool and where will they be positioned?

Heating

Most pools in the UK are heated and Polypool is compatible with all types of heating systems. These include air to water and ground source heat pumps, solar systems, gas or oil pool heaters and electric pool heaters for above ground installations. Please ask one of our consultants or engineers for advice. 01489 890800.

Environmental control within the swimming pool hall

If the project is indoors, there will be a requirement for inclusion of a dehumidification system. This will control the water temperature and the environment in the swimming pool enclosure.

Usage of the swimming pool

Will the swimming pool be used for exercise, fun, hydrotherapy, public use, diving, etc?

Services available to site

Is there access to electrics, water, gas, oil, etc?


Building Process

After all considerations have been made and each point carefully planned, the building process should begin. Shown below is a stage by stage picture sequence of the building process.

Day 1. Marking out


Day 4. Installing the thermal panels


Day 10. Apply the liner

Day 2. Start the digging


Day 5. Screed the base


Day 20. Finishing touches

Installing a pool facts

Vivamus luctus urna sed urna ultricies ac tempor dui sagittis. In condimentum facilisis porta. Sed nec diam eu diam mattis viverra. Nulla fringilla, orci ac euismod semper, magna diam porttitor mauris, quis sollicitudin sapien justo in libero.

Click here to read more

Pool Builder

CGI

Timeline

Technical Support

Polypool provides a fully comprehensive technical support service.

For more information click below.


Others websites from Polypool
PolyPool http://www.polypool.co.uk
Apppools http://www.appools.co.uk
Polyrooms http://www.polyrooms.co.uk